A — Basic information of the case
Project Name:Solid Waste Treatment Solution for Building Materials
Customer Name:Tianjin Urban Construction Group
Project location:Tianjin City
Project start time:2010
B — Project Background and Requirements
Tianjin Urban Construction Group focuses on road and bridge construction, infrastructure and housing construction. During the construction process, a large amount of solid waste of building materials will be generated, which is not only bulky and difficult to store and transfer, but also has various sizes and types. Random disposal can easily have a significant impact on the construction environment and surrounding environment, and does not comply with the concept of "green development road" advocated in China. So can these building material waste be turned into treasure? Longhe solved this problems for customers.
C — Solutions and Effects
In response to customers' needs for equipment that can be used in complex construction site environments, is easy to move, and can efficiently handle various types of building material solid waste, we provide customers with a complete set of building material solid waste treatment solutions, including a dual axis crusher, a multi-functional movable crusher, and conveyor packaging.
In this scheme, the double shaft crusher is used for wood, steel, foam, film, engineering plastic parts, etc., and then sent to the designated place for compression and packaging through the loader after being refined by the multi-functional shredder; The multifunctional crusher can be moved to a designated place for on-site processing without the need for secondary storage. The entire process not only improves the efficiency of waste disposal, but also greatly reduces the impact on the construction environment. The packaged waste will be classified and sent for recycling and reuse.
D — Customer Acceptance
① Machine usage and evaluation: |
Installation and use:
|
Longhe engineers provide on-site guidance and pass the quality inspection
|
Personnel training:
|
Teach and train two engineers for the customers |
|
Use Evaluation |
Crushing status test: | √ Passed
| discharge speed test: | √ Passed
|
Energy consumption noise test: | √ Passed
| Passed dust pollution test:
| √ Easy |
Suitable for crushing building material waste: | √30 types
|
There are dozens of comprehensive evaluation indicators in total, only 5 of which are listed above |
|
② After sales and other cooperation: |
Longhe has been a professional after-sales service provider for Tianjin Urban Construction Group for 12 years, and both parties have been satisfied to this day. Provide equipment for multiple construction sites during the period.
|
E — Project Summary
We have always been committed to providing customers with personalized construction solid waste treatment solutions, tailored to local conditions. In the field of waste recycling and treatment, we have also been deeply rooted for many years. In terms of equipment quality and after-sales service, we have received praise from many customers and are the best choice for purchasing multi-functional shredders!