Emergency Plan for Heat Dissipation at the Pipeline Construction Site of China Petroleum and Natural

  19
Issuing time:2023-04-08 16:31Author:longheSource:Original

A — Basic information of the case

Project Name: Emergency Plan for Construction Site Heat Dissipation

Customer Name: China Petroleum Pipeline Bureau Fourth Company

Project coordinates:Futian City, Fujian Province

Project start time:2016


B — Project Background and Requirements

The Fourth Company of China Petroleum Pipeline Bureau carried out infrastructure construction tasks in Futian in 2016. Due to the need for a large amount of equipment in the project, but the lack of a large cooling equipment system, the progress of the project was slow. Longhe provided an emergency plan after on-site inspection.


C — Solutions and Effects

In response to the customer's need to build a cooling system in the shortest   time and reduce the impact of engineering equipment failures on project progress, Longhe conducted on-site inspections and provided multiple sets of cooling systems consisting of industrial cooling towers and water circulation systems at the project site based on site planning, engineering equipment cooling needs, and total flow rate.


石油01.jpg


D — Customer Acceptance

Machine usage and evaluation:

Installation and use:

Longhe engineers provide on-site guidance and pass the quality inspection

Personnel training:

Teach and train two engineers for the customers


Use Evaluation

Cooling temperature test:

√ Passed

flow rate test:

√ Passed

Pressure test:

√ Passed

noise test:

√ Easy

Overall energy consumption test:

√ Passed

There are dozens of comprehensive evaluation indicators in total, only 5 of which are listed above


②   After sales and other cooperation:


Longhe has provided cooling systems for multiple engineering projects of China Petroleum Pipeline Bureau's four companies since 2016.



E — Project Summary

We have always been committed to providing customers with personalized construction site cooling emergency plans, tailored to local conditions. In the field of personalized equipment customization, we have also been deeply rooted for many years. In terms of equipment quality and after-sales service, we have received praise from many customers and are the best choice for purchasing cooling systems!

LONGHE PLASTIC MACHINERY
24-hour service hotline
+86 020-84211663
Email:cnhlong@cnhlong.com Longhe headquarter:Longxia Economic Development Zone, Chaozhou city,
                                   Guangdong province.