MANUFACTURING PLASTIC MACHINERY 36+ YEARS
Precision quality | Support customization | Lifetime after-sales service

Email:
cnhlong@cnhlong.com

Longhe Series Tutorial: How to Maintain Your Plastic Mixer

VM Vertical Color Mixing Machine Maintenance Tutorial

  53
Issuing time:2024-08-31 11:33Author:longheSource:Original

①:Power Off

②:Remove the central fixing screw of the blades


第二步.gif


③:Loosen the bottom fixing screws and remove the reduction motor

【Large Equipment VM150-300kg】 Use a lifting eye bolt to secure it to the shaft, lift the equipment, then slowly lower the reduction motor after loosening the bottom screws.


第三步大机.gif


【Small Equipment VM25-100kg】 Flip the machine, loosen the bottom screws, and then remove the reduction motor.

小型_02.jpg


④:Remove the oil seal


第四步.gif


Clean the equipment and the reduction motor, then refill with new lubricant oil (refer to the reduction motor disassembly tutorial for details)


第五步.gif


第六步.gif


⑥:Replace the oil seal and the barrel cover gasket


减速机第四步.gif


⑦:Reinstall the reduction motor and blades in sequence


第七步.gif


⑧:Reconnect the power and check the operation of the equipment, ensuring that the wiring is properly secured


LONGHE PLASTIC MACHINERY
Email:
cnhlong@cnhlong.com
Longhe headquarter:Longxia Economic Development Zone, Chaozhou city,
                                   Guangdong province.
Guangzhou branch:Xinxing Plaza,486# Fushi Road,Dashi Str.,Panyu district,
                                 Guangzhou,China.

Scan QR code
Mobile website
Login
Login
leave a message
back to the top