MANUFACTURING PLASTIC MACHINERY 36+ YEARS
Precision quality | Support customization | Lifetime after-sales service

Email:
cnhlong@cnhlong.com

[HS-200]How to use the high speed drying mixer

  37
Issuing time:2024-11-02 17:20Author:LongheSource:Original


Instructions for Use:

Steps

Illustration


Add Oil: Pour high-temperature thermal oil into the oil port until it’s detectable (see Fig. 1).


HS-加油口.jpg


Install Exhaust: Remove the exhaust vent inside the cover and attach it externally (see Fig. 2).


排气口.jpg


Add Material: Lock the cover, and connect power as shown (see Fig. 3).


HS链接电源.jpg


Power On: Switch on the main power, press “NO” to start (see Fig. 4).


开机键.jpg


Set Time and Temperature: Turn the black knob to the timer position and set the desired temperature/time (see Fig. 5).


时间温度.jpg


Start Operation: Press the inverter’s start button to activate the machine (see Fig. 6)


确认.jpg


Stop Operation: Press button ① for a temporary stop; for a long shutdown, press ① then ②, and turn off the main power (see Fig. 7)


停机1.jpg


停机2.jpg



LONGHE PLASTIC MACHINERY
Email:
cnhlong@cnhlong.com
Longhe headquarter:Longxia Economic Development Zone, Chaozhou city,
                                   Guangdong province.
Guangzhou branch:Xinxing Plaza,486# Fushi Road,Dashi Str.,Panyu district,
                                 Guangzhou,China.

Scan QR code
Mobile website
Login
Login
leave a message
back to the top